Full transparency and real-time
feedback on your order status

From design to delivery, our standardized customization process ensures efficient communication and quality control.

Each stage sets clear nodes and delivery results, and a dedicated person will provide you with one-on-one feedback on the production progress, so you can follow up and control the progress throughout the process.

Design evaluation
01

Based on your design draft/product requirements, we will issue a quotation within 24-48 hours (FOB unit price | mold fee | MOQ)

Contract start
02

Both parties sign NDA confidentiality agreement to protect your design and sample development contract

3D design drawing
03

Draw 3D engineering drawings according to your design in 72-96 hours (with tolerance analysis), and enter the proofing stage after you confirm the design

First sample verification
04

Deliver the first sample + SGS material test report (compliant with cp65/REACH) in 7-15 working days, and zoom conference two-way verification

Mass production preparation
05

Pay 30% advance payment after the first sample is approved, the production process is fully transparent, and feedback the production progress to you in real time

Process control
06

Sampling inspection according to ISO2859 standard (open third-party QC on-site), issue “Mid-term Quality Confirmation”

Packaging customization
07

Make packaging materials according to your brand specifications (including drop test report), and upload packaging inspection video simultaneously

Delivery closed loop
08

Shipment within 48 hours after the final payment is received (DDP/DAP), provide: product compliance documents, order traceability code, quality packaging code]

Design evaluation
01

Based on your design draft/product requirements, we will issue a quotation within 24-48 hours (FOB unit price | mold fee | MOQ)

Contract start
02

Both parties sign NDA confidentiality agreement to protect your design and sample development contract

3D design drawing
03

Draw 3D engineering drawings according to your design in 72-96 hours (with tolerance analysis), and enter the proofing stage after you confirm the design

First sample verification
04

Deliver the first sample + SGS material test report (compliant with cp65/REACH) in 7-15 working days, and zoom conference two-way verification

Mass production preparation
05

Pay 30% advance payment after the first sample is approved, the production process is fully transparent, and feedback the production progress to you in real time

Process control
06

Sampling inspection according to ISO2859 standard (open third-party QC on-site), issue “Mid-term Quality Confirmation”

Packaging customization
07

Make packaging materials according to your brand specifications (including drop test report), and upload packaging inspection video simultaneously

Delivery closed loop
08

Shipment within 48 hours after the final payment is received (DDP/DAP), provide: product compliance documents, order traceability code, quality packaging code]